Building your fiber network
From our network to your front door.
Know what to expect as DMCI brings a 100% fiber connection straight to homes in your neighborhood. Follow the journey from the first work on your street to your home’s final connection.

A look behind the build
Meet the crew behind the build.
See DMCI’s crew getting equipment into position for a day in the field. This short, on-site video gives you a closer look at the people and equipment behind the work in your neighborhood.
In the video, crew members unload tracked construction equipment from a trailer and move it along a gravel lane.
43-second silent video. Press play to watch.
Need help with ground restoration?What happens along the way.
01
Plan & prepare
We obtain the necessary approvals and mark the proposed network path. Watch for a postcard or door hanger with contact information before construction.
02
Mark public utilities
Utility crews mark public underground services. Please leave flags and markings in place so crews can work around existing utilities.
03
Build the main line
Crews install conduit and hand holes along the planned route, then install the fiber-optic cable. Work may happen in several visits.
04
Splice, test & restore
We connect and test the fiber. Around hand holes, crews compact and level the ground, remove excess dirt, and seed disturbed areas.
05
Connect your property
For a connection to your home, we review the underground questionnaire, survey the route, have public underground utility lines marked before digging, and install the fiber drop.
06
Schedule your installation
Once your connection is ready, our team schedules the final hookup. An adult needs to be present. First service payment is due at installation.
Your construction questions.
Why are there flags or paint in my yard?
They mark the proposed route or existing utilities. Leave them in place while work is underway. DMCI removes its construction flags after the work is complete.
Does fiber passing my house mean I can connect today?
Not necessarily. Main-line construction, splicing, testing, and the connection to your home are separate steps. Check your address and ask our team to confirm readiness.
What should I tell you about my property?
Let us know about private underground features such as invisible dog fences, sprinklers, propane lines, or power to outbuildings. These may not be marked by the crews who mark public underground utility lines.
How is the ground restored?
DMCI’s construction process includes compacting and leveling around hand holes, removing excess dirt, and seeding disturbed areas. Contact our ground repair team if an area needs additional attention.
When will work at my home be finished?
Timing depends on the route, required utility markings, weather, and the remaining construction stages. Contact our team for an update specific to your property; the map is not an installation appointment.
Do I need to be home?
Our scheduling team will explain what is needed for each visit. You must be present for the final in-home installation and activation.
Ground repair
Tell us what needs attention.
Share your property address, the affected area, and when construction took place so our ground repair team can review your request.
Email groundrepair@dmcibb.net. For an urgent concern, call 877-936-2422.